Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby Anondson » August 7th, 2014, 10:19 am

I didn't see a specific thread for The Yard so I'll post this here, ...
Its being talked about over in the Park System thread in the General forum.

lordmoke
Wells Fargo Center
Posts: 1331
Joined: June 8th, 2012, 1:39 pm
Location: George Floyd Square

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby lordmoke » August 12th, 2014, 7:27 pm

Last tower crane is going up.

Wedgeguy
Capella Tower
Posts: 3404
Joined: June 1st, 2012, 6:59 am

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby Wedgeguy » August 16th, 2014, 7:13 pm

Walking by today a noticed that the elevator tower on the west tower is up about 5-6 floors and there is a good 3/4 for the 1st Floor steel posts in place for the tower to start to rise. I'm very surprised how much of the north side of the block will not be used by the towers. I do know housing will come but until then there is a lot of green space or parking.

User avatar
trkaiser
Landmark Center
Posts: 259
Joined: June 1st, 2012, 9:05 am
Location: Northeast Minneapolis
Contact:

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby trkaiser » August 17th, 2014, 1:57 pm

I posted some new construction updates from today:
http://tomabouttown.wordpress.com/2014/ ... lls-fargo/

grant1simons2
IDS Center
Posts: 4371
Joined: February 8th, 2014, 11:33 pm
Location: Marcy-Holmes

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby grant1simons2 » August 21st, 2014, 4:54 pm

Can someone tell me what's on top of the North building? Looks bright yellow and is too pixelated on the webcam

lordmoke
Wells Fargo Center
Posts: 1331
Joined: June 8th, 2012, 1:39 pm
Location: George Floyd Square

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby lordmoke » August 21st, 2014, 4:59 pm

Can someone tell me what's on top of the North building? Looks bright yellow and is too pixelated on the webcam
Concrete pump. They'll use it to pour the floors when they get up higher.

Silophant
Moderator
Posts: 4470
Joined: June 20th, 2012, 4:33 pm
Location: Whimsical NE

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby Silophant » August 21st, 2014, 6:00 pm

Walking by today a noticed that the elevator tower on the west tower is up about 5-6 floors and there is a good 3/4 for the 1st Floor steel posts in place for the tower to start to rise. I'm very surprised how much of the north side of the block will not be used by the towers. I do know housing will come but until then there is a lot of green space or parking.
Does anyone know, is this part of downtown covered by the "no new surface parking" rule? And, if so, does it apply to these sites which were parking lots before construction?
Joey Senkyr
[email protected]

nickmgray
Union Depot
Posts: 319
Joined: July 3rd, 2012, 10:40 am

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby nickmgray » August 22nd, 2014, 7:15 am

Not sure about the no new surface parking rule, but I'm sure construction of the residential portion of this project will start before the two towers are open for business.

User avatar
Nathan
Capella Tower
Posts: 3695
Joined: June 1st, 2012, 10:42 am

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby Nathan » August 22nd, 2014, 7:18 am

Not sure about the no new surface parking rule, but I'm sure construction of the residential portion of this project will start before the two towers are open for business.
do you mean the residential on the south or north side?I thought the birth side of the towers was going to sit empty for a while

m b p
Nicollet Mall
Posts: 195
Joined: September 3rd, 2012, 5:46 pm

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby m b p » August 22nd, 2014, 8:06 am

The last I read, the residential portions, of both buildings, on the northeast side, were on hold. However, they wanted to start construction of them before finishing construction of the towers + residences on the southwest side (facing the park).

phase i: office portions, park, and residences facing the park.
phase ii: residences on the NE sides of both buildings.

Admittedly, I haven't been following this one too intensely.

MNdible
is great.
Posts: 5989
Joined: June 8th, 2012, 8:14 pm
Location: Minneapolis

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby MNdible » August 22nd, 2014, 9:49 am

The construction duration on the residential buildings on the north side will be so much shorter than the towers, there's no reason for them to get ahead of themselves. They'll use that open space for staging for as long as they possibly can, and that will have the added benefit of giving them flexibility to respond to market conditions when they (or whoever the sell the plats to) actually are ready to go ahead with them.

User avatar
Nathan
Capella Tower
Posts: 3695
Joined: June 1st, 2012, 10:42 am

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby Nathan » August 22nd, 2014, 11:37 am

I just mean those could easily be used as surface parking in the mean time... if they were allowed to.

topher hoefer
Block E
Posts: 21
Joined: October 30th, 2013, 3:55 pm

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby topher hoefer » August 22nd, 2014, 12:03 pm

Well Fargo has mandated that all construction be complete before employees move into the building. Everything is being scheduled out to be completed at the same time and that includes the residential portions.

User avatar
Nathan
Capella Tower
Posts: 3695
Joined: June 1st, 2012, 10:42 am

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby Nathan » August 22nd, 2014, 12:08 pm

Well Fargo has mandated that all construction be complete before employees move into the building. Everything is being scheduled out to be completed at the same time and that includes the residential portions.
But the current construction plan leaves the north eastern thirds of both blocks as blank slates. So at some point those will be constructed on.

Tyler
Foshay Tower
Posts: 976
Joined: June 1st, 2012, 10:10 am

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby Tyler » August 22nd, 2014, 12:17 pm

During a planning commission meeting Ryan claimed that proposals for those block portions would be forthcoming and that while construction would start later it would be completed at the same time. This was presented as something very likely to occur, not as simply a possibility. No idea if anything has changed (air rights development?) or if they were being completely honest in the first place.
Towns!

bubzki2
Foshay Tower
Posts: 811
Joined: September 19th, 2012, 5:38 pm
Location: Snelling-Hamline

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby bubzki2 » August 27th, 2014, 6:52 am

Real steel girders are a couple of floors up now on the first tower. Already looking massive as you walk by.

mattaudio
Stone Arch Bridge
Posts: 7752
Joined: June 19th, 2012, 2:04 pm
Location: NORI: NOrth of RIchfield

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby mattaudio » August 27th, 2014, 8:20 am

This project will be massive. Twice the acreage and twice the sidewalk frontage as IDS or Pillsbury Center. Hopefully the frontage gets done right.

Wedgeguy
Capella Tower
Posts: 3404
Joined: June 1st, 2012, 6:59 am

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby Wedgeguy » August 27th, 2014, 9:32 am

Not sure what is going on with the supposed 2-3 floors. With the steel construction and lack of an elevator door where the 3rd floor should be, I'm not sure what that space will be used for. I know there will be residential blocking this portion of the tower on both sides eventually. But not sure what will go in there as there is no way for it to be parking and they already have an IT operation center so I can't see that as being used for that. But I do see this as moving along very quickly as far as the steel construction goes. I was surprised how much had been added since I was by a week ago.

David Greene
IDS Center
Posts: 4617
Joined: December 4th, 2012, 11:41 am

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby David Greene » August 27th, 2014, 10:30 am

With the steel construction and lack of an elevator door where the 3rd floor should be, I'm not sure what that space will be used for. I know there will be residential blocking this portion of the tower on both sides eventually. But not sure what will go in there as there is no way for it to be parking and they already have an IT operation center so I can't see that as being used for that.
It could be used for a legal department where you want to restrict access to documents. We have part of a floor intentionally blocked from the elevators for exactly this reason. As in, elevators pass through the space but won't stop there. You're forced to go through a security entrance to get to it.

mattaudio
Stone Arch Bridge
Posts: 7752
Joined: June 19th, 2012, 2:04 pm
Location: NORI: NOrth of RIchfield

Re: Downtown East Project (Ryan Companies / Wells Fargo)

Postby mattaudio » August 27th, 2014, 10:52 am

Nope. Probably just a service mezzanine.