Arterial Bus Rapid Transit Corridors
-
- Wells Fargo Center
- Posts: 1779
- Joined: May 31st, 2012, 8:02 pm
- Location: Chicago (ex-Minneapolitan)
Re: Arterial Transit Corridor Study ("rapid bus")
I was reading through the 2040 TPP update that is supposed to go before the Met Council for approval soon, an update on arterial BRT is included:
- Removal of W 7th St BRT from the plan
- Chicago-Fremont is included as the third line, after Snelling and Penn. Projected cost, $77 million
http://www.metrocouncil.org/METC/files/ ... 4105af.pdf
- Removal of W 7th St BRT from the plan
- Chicago-Fremont is included as the third line, after Snelling and Penn. Projected cost, $77 million
http://www.metrocouncil.org/METC/files/ ... 4105af.pdf
-
- Moderator
- Posts: 6405
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Arterial Transit Corridor Study ("rapid bus")
Pages 8-9 of that document (labeled as pages 233-234) just makes me want to eat a bullet.
Met Council TPP: "Here are our key principles for local bus service planning."
Metro Transit SIP: "Here's our new Service Improvement Plan that incorporates none of those principles."
Met Council TPP: "Here are our key principles for local bus service planning."
Metro Transit SIP: "Here's our new Service Improvement Plan that incorporates none of those principles."
-
- Moderator
- Posts: 6405
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Arterial Transit Corridor Study ("rapid bus")
Resurrecting this thread after nearly 2 years of silence. I was skimming the draft update to the 2017-2020 TIP and see that the D Line (first time seeing that name in an official Met Council document) is in the TIP, with a planned opening date of 2020/2021 and a tentative budget of $77MM. This hasn't changed from TCmetro's link above (non-working) which penciled in the same numbers 2 years ago.
DRAFT 2017-2020 TIP (link has been fixed)
We'll have to see how things go with the C Line getting fully funded ($36MM total) before we can even dream about this one becoming a reality. $77MM is a lot for a project that won't be getting any money from CTIB. It's pretty much hoping and praying on federal and Met Council money and a big chunk of the ~2018 bonding bill. Other than "it's the busiest bus line in the region", I think it's going to be a real uphill battle to secure that much funding. The City Council and state legislators are going to have to become champions of this specific project for that to happen, and with the long slate of projects ahead of this one (Orange, SW, Bottineau, C Line, streetcar?), there just doesn't seem to be a way this will get political headwinds until some of those are actually under construction. My concern is that the political capacity doesn't exist to even begin paying attention to this project until 2018 at the soonest (when at least Orange, SW, and C will be under construction.) I guess the important thing for the next ~2 years is that the D Line project is funded for study and engineering, which I'm guessing could cost $5MM for a corridor this long.
DRAFT 2017-2020 TIP (link has been fixed)
We'll have to see how things go with the C Line getting fully funded ($36MM total) before we can even dream about this one becoming a reality. $77MM is a lot for a project that won't be getting any money from CTIB. It's pretty much hoping and praying on federal and Met Council money and a big chunk of the ~2018 bonding bill. Other than "it's the busiest bus line in the region", I think it's going to be a real uphill battle to secure that much funding. The City Council and state legislators are going to have to become champions of this specific project for that to happen, and with the long slate of projects ahead of this one (Orange, SW, Bottineau, C Line, streetcar?), there just doesn't seem to be a way this will get political headwinds until some of those are actually under construction. My concern is that the political capacity doesn't exist to even begin paying attention to this project until 2018 at the soonest (when at least Orange, SW, and C will be under construction.) I guess the important thing for the next ~2 years is that the D Line project is funded for study and engineering, which I'm guessing could cost $5MM for a corridor this long.
-
- Stone Arch Bridge
- Posts: 7767
- Joined: June 19th, 2012, 2:04 pm
- Location: NORI: NOrth of RIchfield
Re: Arterial Transit Corridor Study ("rapid bus")
Too bad Minneapolis can't cough up $15-20M a year for aBRT. Well, we should.
-
- Moderator
- Posts: 6405
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Arterial Transit Corridor Study ("rapid bus")
I'd settle for $5MM/year even. If you figure opening a Minneapolis-centric aBRT line every other year, beginning with the C Line in 2019 and the D Line in 2021, that would be a $10MM city contribution for each project. That's actually a lot when you assume a big chunk of FTA money will pay for the new buses, a Met Council contribution, the fact that the D Line also runs through Brooklyn Center, Richfield, and Bloomington, etc. Maybe the city contribution could be equivalent to half the cost of the stations inside city limits or something.Too bad Minneapolis can't cough up $15-20M a year for aBRT. Well, we should.
-
- IDS Center
- Posts: 4677
- Joined: July 21st, 2013, 8:57 pm
- Location: Where West Minneapolis Once Was
Re: Arterial Transit Corridor Study ("rapid bus")
Is there a end to end map of the D Line?
Re: Arterial Transit Corridor Study ("rapid bus")
Chicago leg is here: http://www.metrotransit.org/Data/Sites/ ... hicago.pdf
Emerson/Fremont is here: http://www.metrotransit.org/Data/Sites/ ... dendum.pdf
Emerson/Fremont is here: http://www.metrotransit.org/Data/Sites/ ... dendum.pdf
-
- IDS Center
- Posts: 4615
- Joined: December 4th, 2012, 11:41 am
Re: Arterial Transit Corridor Study ("rapid bus")
If there was ever a case for a Minneapolis subway, this is it.
Re: Arterial Transit Corridor Study ("rapid bus")
Indeed. Sadly, we're 40 years too late for that to be even vaguely considered.If there was ever a case for a Minneapolis subway, this is it.
-
- IDS Center
- Posts: 4677
- Joined: July 21st, 2013, 8:57 pm
- Location: Where West Minneapolis Once Was
Re: Arterial Transit Corridor Study ("rapid bus")
Thanks EOst!
- mister.shoes
- Wells Fargo Center
- Posts: 1300
- Joined: November 26th, 2012, 10:22 am
Re: Arterial Transit Corridor Study ("rapid bus")
Skipping right past 48th, I see. Huh.
The problem with being an introvert online is that no one knows you're just hanging out and listening.
-
- Stone Arch Bridge
- Posts: 7767
- Joined: June 19th, 2012, 2:04 pm
- Location: NORI: NOrth of RIchfield
Re: Arterial Transit Corridor Study ("rapid bus")
We're working on that, but it's tricky. We think they just spaced these stops out without doing much analysis of the land use around them. At a minimum, we'd like to see stops at 48th and 46th (for transfer to the 46).
But it may make sense to try to hit the old streetcar nodes, in addition to the transfer at 46th: 38th, 41st (maybe not?), 44th, 46th (transfer), 48th, 52nd (spliting the Parkway and 53rd nodes).
Clearly they are fine spacing things differently with the 54th and 56th Street stops, or 60th/Chicago to 60th/Portland. Skipping 48th and Chicago is not acceptable.
But it may make sense to try to hit the old streetcar nodes, in addition to the transfer at 46th: 38th, 41st (maybe not?), 44th, 46th (transfer), 48th, 52nd (spliting the Parkway and 53rd nodes).
Clearly they are fine spacing things differently with the 54th and 56th Street stops, or 60th/Chicago to 60th/Portland. Skipping 48th and Chicago is not acceptable.
Re: Arterial Transit Corridor Study ("rapid bus")
Especially because there isn't really a reason to stop at 50th (aside from that's where I'd get it if I decided to walk over there instead of take the 14).
Re: Arterial Transit Corridor Study ("rapid bus")
The stop locations are just conceptual. Both the A and the C have seen stations moved from these concepts once planning began in earnest.
-
- IDS Center
- Posts: 4369
- Joined: February 8th, 2014, 11:33 pm
- Location: Marcy-Holmes
Re: Arterial Transit Corridor Study ("rapid bus")
E Line should continue up into University where the 6U already goes. Making the final stop Stadium Village station.
Re: Arterial Transit Corridor Study ("rapid bus")
Not sure I love the perception of Minneapolis getting SW, Bottineau, Orange, half of A and lines B, C, D, and E before anyone considers the E 7th line, especially with several reconstruction projects planned or upcoming for the 2020-period. Maybe that timeline will shift once Riverview/Rush planning is complete, but man.
-
- Wells Fargo Center
- Posts: 1675
- Joined: March 30th, 2016, 1:26 pm
Re: Arterial Transit Corridor Study ("rapid bus")
There has to be a way to speed this up. I thought the original plan was opening one ABRT route every year.
Re: Arterial Transit Corridor Study ("rapid bus")
Agreed. It would be nice if the E Line did its own thing in addition to being a Band-Aid for the crappy SWLRT routing.E Line should continue up into University where the 6U already goes. Making the final stop Stadium Village station.
To be nitpicky, the B Line extends a bit more than twice as far into St. Paul as the A Line extends into Minneapolis, but, yeah, it's pretty lopsided.Not sure I love the perception of Minneapolis getting SW, Bottineau, Orange, half of A and lines B, C, D, and E before anyone considers the E 7th line, especially with several reconstruction projects planned or upcoming for the 2020-period. Maybe that timeline will shift once Riverview/Rush planning is complete, but man.
Assuming the state wanted to play ball with funding, since Republicans keep talking about how much they would prefer enhanced buses to choo-choos. That didn't happen, though.There has to be a way to speed this up. I thought the original plan was opening one ABRT route every year.
Joey Senkyr
[email protected]
[email protected]