Mozaic (all phases)
-
- Stone Arch Bridge
- Posts: 7767
- Joined: June 19th, 2012, 2:04 pm
- Location: NORI: NOrth of RIchfield
Re: Mozaic (all phases)
You'd think there's a way to activate your vacant parcels (and maybe even generate some revenue!) while you await those ambitious projects. I mean, come on. https://goo.gl/maps/Y7Q3teN5qMD2 Get some hipsters and shipping containers, stat!
Re: Mozaic (all phases)
The thing is though that Ackerberg has failed at building anything other than a taxpayer subsidized parking ramp. I don't think there are glorious projects at the end of the rainbow, just eternally vacant lots. I don't think he is ever going to get anything built. His hotel got beat to the market by a competitor. The first draft of Mozaic was great but by the time it was ready, the market for condos had collapsed. How long has the lot next to Calhoun Square been vacant? When I moved here in 1987 it was surface parking. How much longer should we wait, twenty years, fifty years? A five story midrise is better than a beautiful project that will never be built. All we are getting is a scar in Uptown's urban fabric that never goes away.
-
- IDS Center
- Posts: 4092
- Joined: June 3rd, 2012, 9:33 pm
- Location: Merriam Park, St. Paul
Re: Mozaic (all phases)
Q. What, what? A. In da butt.
Re: Mozaic (all phases)
That's not quite true. My house I bought in 1990 a block away and there was a Taco Bell there until around 93.The thing is though that Ackerberg has failed at building anything other than a taxpayer subsidized parking ramp. I don't think there are glorious projects at the end of the rainbow, just eternally vacant lots. I don't think he is ever going to get anything built. His hotel got beat to the market by a competitor. The first draft of Mozaic was great but by the time it was ready, the market for condos had collapsed. How long has the lot next to Calhoun Square been vacant? When I moved here in 1987 it was surface parking. How much longer should we wait, twenty years, fifty years? A five story midrise is better than a beautiful project that will never be built. All we are getting is a scar in Uptown's urban fabric that never goes away.
Re: Mozaic (all phases)
Wasn't that the Music-Go-Round on that block as well?
Re: Mozaic (all phases)
Yes and that didn't leave until after I moved away in 2005.
Re: Mozaic (all phases)
Well. 12 years is so much better. Good talk.
Re: Mozaic (all phases)
I don't love the fact that it's sitting empty either, but there's a huge difference between 30 years and 12 years, especially since there was a massive recession that chewed up a lot of those years (and sent a lot of projects back to the drawing boards).
-
- Moderator
- Posts: 6405
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Mozaic (all phases)
True, but I think the criticism that Ackerberg hasn't built squat in this cycle is a fair one. Ackerberg is a property owner/manager, not a developer. It's absurd that this site continues to sit empty. If a hotel doesn't pencil out and/or you can't attract a large office tenant, sell to CPM so they can build another 6-story apartment building with some retail/office space and cash the damn check.
Re: Mozaic (all phases)
Music Go Round was only half the block. The other half was a surface parking extension of the Calhoun Square ramp. I use to park there when Ravenswood Books was still in Calhoun Square, which was in the early '90s.
-
- IDS Center
- Posts: 4092
- Joined: June 3rd, 2012, 9:33 pm
- Location: Merriam Park, St. Paul
Re: Mozaic (all phases)
And before it was taco bell, that lot was..... parking!
Q. What, what? A. In da butt.
Re: Mozaic (all phases)
And before that Zantigo!And before it was taco bell, that lot was..... parking!
-
- IDS Center
- Posts: 4092
- Joined: June 3rd, 2012, 9:33 pm
- Location: Merriam Park, St. Paul
-
- Moderator
- Posts: 6405
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Mozaic (all phases)
I wish to partially retract my previous comment condemning Ackerberg for not building anything. As it turns out, Ackerberg has owned Calhoun Square for just under 3 years. So while the site has been fully vacant for ~12 years (and at least partially vacant much longer, thanks everyone for the history) it's been less than 3 years under current ownership.
So while I can give Ackerberg a break on those grounds, the rest of my comment stands - Ackerberg hasn't built squat this boom cycle, aside from Mozaic itself, which arguably has one foot in the pre-recession era, one foot in the current boom.
So while I can give Ackerberg a break on those grounds, the rest of my comment stands - Ackerberg hasn't built squat this boom cycle, aside from Mozaic itself, which arguably has one foot in the pre-recession era, one foot in the current boom.
Re: Mozaic (all phases)
Are you referring specifically to Uptown? Because they've definitely done projects around town.
-
- Landmark Center
- Posts: 269
- Joined: June 12th, 2012, 7:45 pm
Re: Mozaic (all phases)
The parking lot behind Lagoon closes next week in anticipation of construction. This is happening.
Aaron Eisenberg / Realtor, Keller Williams Integrity
612.568.5828 / [email protected] / 1350 Lagoon Ave #900
http://www.agentaaron.com
612.568.5828 / [email protected] / 1350 Lagoon Ave #900
http://www.agentaaron.com
-
- IDS Center
- Posts: 4369
- Joined: February 8th, 2014, 11:33 pm
- Location: Marcy-Holmes
Re: Mozaic (all phases)
No way. Didn't permits expire?
Re: Mozaic (all phases)
Weird that it hasn't been in the news recently...
-
- Moderator
- Posts: 6405
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Mozaic (all phases)
The approvals for this project would have expired on September 29, 2016, according to the Planning Commission report.No way. Didn't permits expire?