Re: Stick vs. Concrete / Construction Quality Issues
Raleigh right now. Stick frame building is a blaze.
-
- Stone Arch Bridge
- Posts: 7682
- Joined: June 19th, 2012, 2:04 pm
- Location: NORI: NOrth of RIchfield
Re: Stick vs. Concrete / Construction Quality Issues
Just came here to post that... Sounds like it was under construction. Five alarm fire, completely destroyed in a few short hours.
It seems like there's a lot of stick-build risk when these buildings are under construction or renovation. But are they at risk when they are sprinklered, partitioned into hundreds of smaller spaces with fire-rated drywall, separated by fire-rated doors, etc? Seems like the risk is just during construction.
It seems like there's a lot of stick-build risk when these buildings are under construction or renovation. But are they at risk when they are sprinklered, partitioned into hundreds of smaller spaces with fire-rated drywall, separated by fire-rated doors, etc? Seems like the risk is just during construction.
-
- Stone Arch Bridge
- Posts: 7682
- Joined: June 19th, 2012, 2:04 pm
- Location: NORI: NOrth of RIchfield
Re: Stick vs. Concrete / Construction Quality Issues
Apartment Fires Are Tied to Cheaper, Wood-Based Construction
Blazes at construction sites raise questions about use of wooden frames instead of higher-cost metal ones
https://www.theatlantic.com/business/ar ... nt/532437/
Blazes at construction sites raise questions about use of wooden frames instead of higher-cost metal ones
https://www.theatlantic.com/business/ar ... nt/532437/
-
- Moderator
- Posts: 6329
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Stick vs. Concrete / Construction Quality Issues
Question: what's the average time from groundbreaking to completion & occupancy of a stick project with underground parking? Does 4 stories vs. 6 stories make a major impact on the timeline, or is that just a few extra weeks? How about smaller projects without underground parking, like the 3535 Grand Ave S project?
The reason for my question is related to the 2020 Census. What is the absolute latest that a project with underground parking could begin construction and be occupied on April 1, 2020? For the purposes of this inquiry, I'm not considering large tower projects like 200 Central and The Eleven...we already know those won't be occupied by Census day.
The reason for my question is related to the 2020 Census. What is the absolute latest that a project with underground parking could begin construction and be occupied on April 1, 2020? For the purposes of this inquiry, I'm not considering large tower projects like 200 Central and The Eleven...we already know those won't be occupied by Census day.
-
- Wells Fargo Center
- Posts: 1025
- Joined: February 20th, 2015, 12:38 pm
-
- Moderator
- Posts: 6329
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Stick vs. Concrete / Construction Quality Issues
Thanks. It looks like 16-18 months is pretty typical for a larger (50+ unit) project, which squares with what I've heard around here.
So for a 4-6 story 50+ unit building to have residents moving in by 4/1/2020 (Census Day), they'd need to be excavating no later than October/November of this year. Good to know.
So for a 4-6 story 50+ unit building to have residents moving in by 4/1/2020 (Census Day), they'd need to be excavating no later than October/November of this year. Good to know.
Re: Stick vs. Concrete / Construction Quality Issues
Also, remember that most buildings aren't going to be fully occupied on opening day -- there's typically a gradual lease-up over six months or so.
-
- Landmark Center
- Posts: 267
- Joined: January 20th, 2018, 11:36 pm
Re: Stick vs. Concrete / Construction Quality Issues
And there are echoes in at least some of the agitation of standard-variety Nimbyism.
-
- IDS Center
- Posts: 4701
- Joined: July 21st, 2013, 8:57 pm
- Location: Where West Minneapolis Once Was
Re: Stick vs. Concrete / Construction Quality Issues
Kinda related to the topic, a startup with a model for modular construction of apartments and hotels.
https://www.bizjournals.com/twincities/ ... costs.html
Seems like a necessary but very late thing.
https://www.bizjournals.com/twincities/ ... costs.html
Seems like a necessary but very late thing.
-
- Moderator
- Posts: 6329
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Stick vs. Concrete / Construction Quality Issues
Milwaukee got a 25-story mass timber apartment building, tallest in the world (for now).
Ascent MKE: https://www.fs.usda.gov/inside-fs/deliv ... ding-opens
I can't imagine it will be much longer before Mpls gets another mass timber building that will top the T3 (Amazon office) in North Loop. Heck, just copy-paste the Ascent onto any open lot downtown.
Ascent MKE: https://www.fs.usda.gov/inside-fs/deliv ... ding-opens
I can't imagine it will be much longer before Mpls gets another mass timber building that will top the T3 (Amazon office) in North Loop. Heck, just copy-paste the Ascent onto any open lot downtown.