Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
According to the planning commission actions, the Starbucks was denied
Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
So ends the last drive-through in Minneapolis.
Joey Senkyr
joey.senkyr@outlook.com
joey.senkyr@outlook.com
-
- Stone Arch Bridge
- Posts: 7708
- Joined: June 19th, 2012, 2:04 pm
- Location: NORI: NOrth of RIchfield
Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
They're still in the appeal window, but I can't imagine they'd have any chance of success at that.
-
- Moderator
- Posts: 6227
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
I can’t imagine they won’t file an appeal, given the sunk costs for the project thus far. I also can’t see the city council approving the appeal, over the objections of Public Works.
Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
I mean, that's the opposite of how one is supposed to think about sunk costs, but yeah.
-
- Moderator
- Posts: 6227
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
How dare you make me look up the correct usage of “sunk costs”. I’m a planner, not an economistI mean, that's the opposite of how one is supposed to think about sunk costs, but yeah.

Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
I'd say you're both right -- rationally, people shouldn't consider the sunk costs, but people aren't always rational.How dare you make me look up the correct usage of “sunk costs”. I’m a planner, not an economist![]()
Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
I mean, it's called the sunk costs fallacy for a reason.I'd say you're both right -- rationally, people shouldn't consider the sunk costs, but people aren't always rational.
Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
They did appeal. Zoning and planning committee delayed their vote. I would recommend writing your council member if you want this drive thru stopped.
https://twitter.com/wedgelive/status/11 ... 04448?s=21
https://twitter.com/wedgelive/status/11 ... 04448?s=21
-
- Moderator
- Posts: 6227
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
This was approved on Thursday, subject to the following conditions:
1. All site improvements shall be completed by September 23, 2021, unless extended by the Zoning Administrator, or the permit may be revoked for non-compliance.
2. CPED staff shall review and approve the final site, elevation, landscaping, and lighting plans before building permits may be issued.
3. All signs shall comply with Chapter 543 of the zoning code. All signage requires a separate permit from CPED.
4. Any decreases in floor area shall not be permitted.
5. The portion of the office building along Hiawatha Avenue shall be no less than 16 feet in depth as shown in the submitted floor plans.
6. No business licenses shall be issued for the proposed coffee shop until the liner building fronting Hiawatha Avenue and E 42nd Street is constructed.
7. The lighting plan shall be revised to demonstrate how all building entrances and walkways will be lit to maintain a minimum acceptable level of security while not creating glare or excessive lighting of the site to comply with sections 530.130 and 530.260 of the zoning code.
8. Three canopy trees and eight ornamental trees shall be planted on-site as shown in the submitted landscaping plan.
9. The signage, curb cut, and driveway access shall be designed to prevent left turns into and out of the site.
10. The applicant shall work with Public Works to modify the street design of E 42nd Street to prohibit left turns into the site.
11. The applicant shall obtain an approved Transportation Demand Management Plan (TDMP) prior to the issuance of any building permits or business licenses and shall maintain compliance with the TDMP for the life of the drive-through including but not limited to providing traffic enforcement as deemed necessary.
The vote was de facto unanimous for approval, but Goodman voted no because she did not support the addition of condition 11, due to fears the city would be sued over it. You'll have to watch the replay for more specifics.
Kudos to CPED staff for coming up with condition #6, which prevents the Starbucks from opening until the "liner office building" along Hiawatha is built. Without that in place, Starbucks could have opened and the liner building quietly cancelled by the developer. This site plan is still the kookiest thing I've ever seen and I don't believe it will be built, unless they somehow already have a suitor for the office space who's willing to build and occupy as planned. I'm honestly surprised that Starbucks corporate is even on board with this design.
1. All site improvements shall be completed by September 23, 2021, unless extended by the Zoning Administrator, or the permit may be revoked for non-compliance.
2. CPED staff shall review and approve the final site, elevation, landscaping, and lighting plans before building permits may be issued.
3. All signs shall comply with Chapter 543 of the zoning code. All signage requires a separate permit from CPED.
4. Any decreases in floor area shall not be permitted.
5. The portion of the office building along Hiawatha Avenue shall be no less than 16 feet in depth as shown in the submitted floor plans.
6. No business licenses shall be issued for the proposed coffee shop until the liner building fronting Hiawatha Avenue and E 42nd Street is constructed.
7. The lighting plan shall be revised to demonstrate how all building entrances and walkways will be lit to maintain a minimum acceptable level of security while not creating glare or excessive lighting of the site to comply with sections 530.130 and 530.260 of the zoning code.
8. Three canopy trees and eight ornamental trees shall be planted on-site as shown in the submitted landscaping plan.
9. The signage, curb cut, and driveway access shall be designed to prevent left turns into and out of the site.
10. The applicant shall work with Public Works to modify the street design of E 42nd Street to prohibit left turns into the site.
11. The applicant shall obtain an approved Transportation Demand Management Plan (TDMP) prior to the issuance of any building permits or business licenses and shall maintain compliance with the TDMP for the life of the drive-through including but not limited to providing traffic enforcement as deemed necessary.
The vote was de facto unanimous for approval, but Goodman voted no because she did not support the addition of condition 11, due to fears the city would be sued over it. You'll have to watch the replay for more specifics.
Kudos to CPED staff for coming up with condition #6, which prevents the Starbucks from opening until the "liner office building" along Hiawatha is built. Without that in place, Starbucks could have opened and the liner building quietly cancelled by the developer. This site plan is still the kookiest thing I've ever seen and I don't believe it will be built, unless they somehow already have a suitor for the office space who's willing to build and occupy as planned. I'm honestly surprised that Starbucks corporate is even on board with this design.
Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
Some silos being redeveloped without being demolished:
https://www.bizjournals.com/twincities/ ... tubes.html
https://www.bizjournals.com/twincities/ ... tubes.html
-
- Nicollet Mall
- Posts: 165
- Joined: June 2nd, 2012, 8:49 am
- Location: Northrop, South Minneapolis
Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
The old Bridgeman’s/Somtaste came down in the last week, and there a good deal of activity on site. Upon looking at the approved plans for 4757 Hiawatha, it looks like the front door will be along the stub of Nawadaha Boulevard, halfway between Hiawatha and Minnehaha. I wonder if the address will change.
Sent from my iPhone using Tapatalk
Sent from my iPhone using Tapatalk
Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
But is it site activity, or spillover from the sewer work going on the Hiawatha bridge?
-
- Wells Fargo Center
- Posts: 1620
- Joined: June 4th, 2012, 12:03 pm
Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
It's site activity - the MetCouncil sewer work doesn't come near the parking lot - but stays in the lot south of Nawadaha.But is it site activity, or spillover from the sewer work going on the Hiawatha bridge?
-
- Wells Fargo Center
- Posts: 1620
- Joined: June 4th, 2012, 12:03 pm
Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
The Pet Supplies Plus store just to the north of this lot has a Hiawatha Address: 4751 Hiawatha Ave, Minneapolis, MN 55406, which was also true for Bridgeman's when it was open: 4757 Hiawatha Ave, Minneapolis, MN 55406.The old Bridgeman’s/Somtaste came down in the last week, and there a good deal of activity on site. Upon looking at the approved plans for 4757 Hiawatha, it looks like the front door will be along the stub of Nawadaha Boulevard, halfway between Hiawatha and Minnehaha. I wonder if the address will change.
-
- Nicollet Mall
- Posts: 165
- Joined: June 2nd, 2012, 8:49 am
- Location: Northrop, South Minneapolis
Re: Hiawatha-Minnehaha Corridor Development & MinHi Line
Correct on the addresses, though plenty of addresses change as construction progresses (note the 240 to 250 to 270 and maybe back to 240 Hennepin project). It's just speculation given that the main entrance will be just about as far as you can get from Hiawatha Avenue and still be on a public street.
-
- Wells Fargo Center
- Posts: 1620
- Joined: June 4th, 2012, 12:03 pm
Re: Hiawatha-Minnehaha Development & RR Corridor/MinHi Line
Images I snapped our walk to get Venn crowlers with curbside pickup from Elevated Liquors yesterday 4/21/20.The old Bridgeman’s/Somtaste came down in the last week, and there a good deal of activity on site.
Looks like this should go up pretty quickly.


Re: Hiawatha-Minnehaha Corridor Development & MinHi Line
late to the party here but what exactly is going up in this space?
-
- Wells Fargo Center
- Posts: 1620
- Joined: June 4th, 2012, 12:03 pm
Re: Hiawatha-Minnehaha Corridor Development & MinHi Line
Apartments: http://www.minneapolismn.gov/www/groups ... 214028.pdflate to the party here but what exactly is going up in this space?