Re: Blue Line Extension - Bottineau LRT
More reason state and local governments should just build things on their own, because federal dollars create risk for delay and come with strings attached.
-
Tom H.
- US Bank Plaza
- Posts: 699
- Joined: September 4th, 2012, 5:23 am
- Has thanked: 2 times
- Been thanked: 15 times
Re: Blue Line Extension - Bottineau LRT
Maybe we just start holding back some of our $100bn+ federal tax receipts to reimburse us for the "unpaid invoices" from the federal government.
(I know, I know - that's not how federal taxes work in practice.)
(I know, I know - that's not how federal taxes work in practice.)
-
mattaudio
- Stone Arch Bridge
- Posts: 7621
- Joined: June 19th, 2012, 2:04 pm
- Location: NORI: NOrth of RIchfield
- Has thanked: 87 times
- Been thanked: 40 times
Re: Blue Line Extension - Bottineau LRT
jack nicholson grin nod dot gif
Yes. Devolution of power back to state and local government is exactly what allows progressives and conservatives to both get the future they want, in different places.
Yes. Devolution of power back to state and local government is exactly what allows progressives and conservatives to both get the future they want, in different places.
-
HiawathaGuy
- Wells Fargo Center
- Posts: 1631
- Joined: June 4th, 2012, 12:03 pm
- Been thanked: 9 times
Re: Blue Line Extension - Bottineau LRT
Utah FrontRunner double-track project advances to engineering phaseBikesOnFilm wrote: July 9th, 2026, 10:03 am A good canary project would be the Utah FrontRunner 2X project. FTA’s annual report documents anticipate awarding the grant in August 2026. If that doesn’t happen, or there’s an unexplained delay, that could be a bad sign.
The Federal Transit Administration has given approval for Utah Transit Authority’s FrontRunner 2X program to enter the engineering phase of development, moving the double-tracking project close to receiving $1.28 billion in federal funding.
https://www.trains.com/pro/passenger/co ... ing-phase/
-
nils
- City Center
- Posts: 43
- Joined: June 1st, 2025, 11:09 am
- Has thanked: 4 times
- Been thanked: 1 time
Re: Blue Line Extension - Bottineau LRT
Has the idea of waiting 12 months to see how SWLRT ridership compares with expectations been seriously floated by anyone in state gov?
After decades of delays, a ~12-month wait doesn’t seem unreasonable, especially when we’re talking about better assessing the assumptions behind a 100-year investment.
If SWLRT performs well, that could strengthen the case for putting more funding into the system, potentially adding designated right of way in key areas. Or, if it underperforms, we’d at least have another real-world data point to better inform a multi-billion-dollar investment and make whatever adjustments are necessary.
After decades of delays, a ~12-month wait doesn’t seem unreasonable, especially when we’re talking about better assessing the assumptions behind a 100-year investment.
If SWLRT performs well, that could strengthen the case for putting more funding into the system, potentially adding designated right of way in key areas. Or, if it underperforms, we’d at least have another real-world data point to better inform a multi-billion-dollar investment and make whatever adjustments are necessary.
-
angrysuburbanite
- Rice Park
- Posts: 458
- Joined: December 31st, 2023, 4:43 pm
- Has thanked: 55 times
- Been thanked: 98 times
Re: Blue Line Extension - Bottineau LRT
SWLRT is such a different project that I don't think 12 months of it in operation would be worth anything in regards to "proving" that Bottineau LRT is worthy of more infrastructure. As much as I support SWLRT, I highly doubt that it will perform well enough to drum up more support for LRT for many years after operations begin, nor do I think its underperformance should prevent projects like BLRT from getting off the ground.
The biggest hitch is that 30 million dollars of the state's contributions to the project funds expire next year, leaving the project with an even larger gap to deal with funding wise. Right now Hennepin County is in a stalemate with the Met Council to fill the existing funding gap, and delaying another year means the FFGA application and various other steps would need to be redone. If you wanted to re-engineer things to have different infrastructure the delay would almost certainly stretch out for many more years beyond that 12 months. They're already tight on money for the current version of the project, I can't imagine a version with more grade separation would be able to find enough money either.
Frustratingly, according to the slides from the last meeting, Hennepin County has 358 million dollars committed for future cost overruns (even though the project already has a 32.5% contingency) that could be used to immediately fill the existing gap (224 million), but they seem a bit hesitant to use it, instead requesting for the Met Council to use their own funding (which isn't possible due to post-SWLRT legislation and various other policies) to fill the gap. Ultimately, the FTA grant is probably the bigger question mark, which is why it is probably more important than anything to submit a FFGA application ASAP before the project gets more expensive or we have to redo an environmental analysis or risk analysis or something.
https://metrocouncil.org/Council-Meetin ... pdate.aspx
The biggest hitch is that 30 million dollars of the state's contributions to the project funds expire next year, leaving the project with an even larger gap to deal with funding wise. Right now Hennepin County is in a stalemate with the Met Council to fill the existing funding gap, and delaying another year means the FFGA application and various other steps would need to be redone. If you wanted to re-engineer things to have different infrastructure the delay would almost certainly stretch out for many more years beyond that 12 months. They're already tight on money for the current version of the project, I can't imagine a version with more grade separation would be able to find enough money either.
Frustratingly, according to the slides from the last meeting, Hennepin County has 358 million dollars committed for future cost overruns (even though the project already has a 32.5% contingency) that could be used to immediately fill the existing gap (224 million), but they seem a bit hesitant to use it, instead requesting for the Met Council to use their own funding (which isn't possible due to post-SWLRT legislation and various other policies) to fill the gap. Ultimately, the FTA grant is probably the bigger question mark, which is why it is probably more important than anything to submit a FFGA application ASAP before the project gets more expensive or we have to redo an environmental analysis or risk analysis or something.
https://metrocouncil.org/Council-Meetin ... pdate.aspx
Last edited by angrysuburbanite on September 4th, 2026, 8:43 pm, edited 2 times in total.
-
Bakken2016
- Wells Fargo Center
- Posts: 1206
- Joined: September 20th, 2017, 12:40 pm
- Location: North Loop
- Has thanked: 76 times
- Been thanked: 34 times
Re: Blue Line Extension - Bottineau LRT
I do believe Hennepin County hasn’t refused to use the cost-overage money, that was just proposed by the Met Council this past Wednesday as a solution to filling the gap.
Sent from my iPhone using Tapatalk
Sent from my iPhone using Tapatalk
-
BikesOnFilm
- Wells Fargo Center
- Posts: 1338
- Joined: February 20th, 2015, 12:38 pm
- Has thanked: 52 times
- Been thanked: 123 times
Re: Blue Line Extension - Bottineau LRT
This debate came to a head today at the CMC meeting. Irene Fernando and various Met Council representatives went back and forth on the subject, with Fernando more or less asking "If we fill the $224 million gap with this $358 million funding pot, and the FTA comes back and asks for the $358 million at some point, will Hennepin suddenly have to pull the difference out of the ether?" And the Met Council artfully tries to avoid saying yes to that question, but also makes it very clear they are not going to provide any capital funding.angrysuburbanite wrote: September 4th, 2026, 8:36 pm Frustratingly, according to the slides from the last meeting, Hennepin County has 358 million dollars committed for future cost overruns (even though the project already has a 32.5% contingency) that could be used to immediately fill the existing gap (224 million), but they seem a bit hesitant to use it, instead requesting for the Met Council to use their own funding (which isn't possible due to post-SWLRT legislation and various other policies) to fill the gap. Ultimately, the FTA grant is probably the bigger question mark, which is why it is probably more important than anything to submit a FFGA application ASAP before the project gets more expensive or we have to redo an environmental analysis or risk analysis or something.
https://metrocouncil.org/Council-Meetin ... pdate.aspx
I know we really don't think about transit in this way, but with nearly $2.5b of funding coming directly from Hennepin County (between the county's original commitment to the project, the HCRRA commitment, and this additional pot of $358m), at some point someone needs to ask why we can't start drawing up plans for what $2.5b gets us, especially if forgoing federal funds means we can drop the massive contingency.
Because yes, it is frustrating to require the budget to have a 30% contingency, and then ask for a second 10% contingency fund on top of that. But I can't say I disagree with Fernando being upset that the Met Council is quick to spend Hennepin County's money to possibly create a future situation where Hennepin County will be forced to come up with even more money last minute.
Last edited by BikesOnFilm on September 24th, 2026, 10:02 pm, edited 2 times in total.
-
angrysuburbanite
- Rice Park
- Posts: 458
- Joined: December 31st, 2023, 4:43 pm
- Has thanked: 55 times
- Been thanked: 98 times
Re: Blue Line Extension - Bottineau LRT
They are running out of time to figure this out, aren't they? At this point I don't really care how they get the funds, as long as they actually secure enough to prevent this project from falling into purgatory.
-
BikesOnFilm
- Wells Fargo Center
- Posts: 1338
- Joined: February 20th, 2015, 12:38 pm
- Has thanked: 52 times
- Been thanked: 123 times
Re: Blue Line Extension - Bottineau LRT
They're cutting it close, to be sure. There are some other final legal agreements that need to be signed with Xcel, BNSF, and CPKC before the FTA will allow them to submit their FFGA which are in review right now, so it's not like if Hennepin rubber stamped this tomorrow they'd be submitting before the weekend anyway. They are going to have another meeting in October, when their regularly scheduled meeting wouldn't be until December, so there is some urgency it sounds like.
I will say that the headways for future LRT lines were already bad enough before the legislature tied up the Met Council's ability to provide capital funds. Engaging with the regulatory hurdles and trying to game the funding rubrics of the FTA is a process that no longer makes sense if your local commitment is most of the money, and as much as I like trains and expanding our transit system, I would side eye my commissioner if they suggested we go through this again.
And while I know there are more factors and putting it this way flattens the issue, Irene Fernando isn't wrong to point out that we spared no expense to build mile long bridges and tunnels under bike paths to reach the rich suburbs, and then suddenly changed the funding rules with regards to the Met Council and might leave Hennepin on the hook for as much as $2.8b to build the value engineered train to the poor suburbs. Again, I like trains and I think this needs to be built, but as a Hennepin County taxpayer that does leave me a bit frustrated!
I will say that the headways for future LRT lines were already bad enough before the legislature tied up the Met Council's ability to provide capital funds. Engaging with the regulatory hurdles and trying to game the funding rubrics of the FTA is a process that no longer makes sense if your local commitment is most of the money, and as much as I like trains and expanding our transit system, I would side eye my commissioner if they suggested we go through this again.
And while I know there are more factors and putting it this way flattens the issue, Irene Fernando isn't wrong to point out that we spared no expense to build mile long bridges and tunnels under bike paths to reach the rich suburbs, and then suddenly changed the funding rules with regards to the Met Council and might leave Hennepin on the hook for as much as $2.8b to build the value engineered train to the poor suburbs. Again, I like trains and I think this needs to be built, but as a Hennepin County taxpayer that does leave me a bit frustrated!
Re: Blue Line Extension - Bottineau LRT
As an aside, it would be interesting to track the state and met council public investment in transportation infrastructure aesthetics, design quality and landscaping by region to see what differences there are. The quality is noticeably different in the sw suburbs in my opinion.
-
BikesOnFilm
- Wells Fargo Center
- Posts: 1338
- Joined: February 20th, 2015, 12:38 pm
- Has thanked: 52 times
- Been thanked: 123 times
Re: Blue Line Extension - Bottineau LRT
A little frustrating that the Project Decisions Board/PDB for this project doesn't have recorded meetings.
They had a meeting on October 29th where item 6 on the agenda was "Further Scope Reductions," but they have no meeting materials to go along with the agenda. And by the time meeting minutes are published, whatever changes were discussed will probably have been publicly announced at that point.
I have to imagine deferring a station or two would close the budget gap, but I'm sure that would be a contentious subject.
They had a meeting on October 29th where item 6 on the agenda was "Further Scope Reductions," but they have no meeting materials to go along with the agenda. And by the time meeting minutes are published, whatever changes were discussed will probably have been publicly announced at that point.
I have to imagine deferring a station or two would close the budget gap, but I'm sure that would be a contentious subject.
-
twincitizen
- Moderator
- Posts: 6349
- Joined: May 31st, 2012, 7:27 pm
- Location: Lake Hiawatha
- Has thanked: 39 times
- Been thanked: 114 times
Re: Blue Line Extension - Bottineau LRT
We are so back(?)
With a trifecta in MN and a Democratic Congress, I assume the Blue Line extension will move full steam ahead. I think the lame-duck Trump administration will have bigger priorities than withholding FTA funds to shovel-ready projects. The GOP Congress may still pass a 5-year transportation bill in the lame duck session that zeroes out transit capital grant funding, but the next Congress could easily pass a supplemental bill next year in line with their priorities, like restoring transit and active transportation funding, restoring Biden-era climate legislation, etc.
With a trifecta in MN and a Democratic Congress, I assume the Blue Line extension will move full steam ahead. I think the lame-duck Trump administration will have bigger priorities than withholding FTA funds to shovel-ready projects. The GOP Congress may still pass a 5-year transportation bill in the lame duck session that zeroes out transit capital grant funding, but the next Congress could easily pass a supplemental bill next year in line with their priorities, like restoring transit and active transportation funding, restoring Biden-era climate legislation, etc.
-
BikesOnFilm
- Wells Fargo Center
- Posts: 1338
- Joined: February 20th, 2015, 12:38 pm
- Has thanked: 52 times
- Been thanked: 123 times
Re: Blue Line Extension - Bottineau LRT
To me, the trifecta looks like an opportunity to roll back the restrictions on the Met Council funding transit, since those restrictions are currently being used by the council to demand Hennepin County add even more to it's $2.25 billion obligation to the BLE.
Hopefully that's a discussion happening in the aftermath of a signed FTA agreement about how the restrictions were well meaning but ultimately damaging to local interests, because I don't think even a trifecta would be enough to get $700m for light rail out of state funds.
Hopefully that's a discussion happening in the aftermath of a signed FTA agreement about how the restrictions were well meaning but ultimately damaging to local interests, because I don't think even a trifecta would be enough to get $700m for light rail out of state funds.
-
twincitizen
- Moderator
- Posts: 6349
- Joined: May 31st, 2012, 7:27 pm
- Location: Lake Hiawatha
- Has thanked: 39 times
- Been thanked: 114 times
Re: Blue Line Extension - Bottineau LRT
Does anyone know why the FTA "match" for the Blue Line Extension is only $752 million and not closer to 40% of the total project cost? I thought FTA used to contribute like 40-50% to New Starts projects.
-
MNdible
- is great.
- Posts: 6017
- Joined: June 8th, 2012, 8:14 pm
- Location: Minneapolis
- Has thanked: 54 times
- Been thanked: 46 times
Re: Blue Line Extension - Bottineau LRT
I think that the match was locked in under the original budget, before the massive rerouting blew that up.
It does seem like the kind of thing that more friendly faces in Washington could easily fix, with a couple of lines inserted in a transportation bill. It's the work of actual governing that a Martin Sabo would have fixed years ago, and that Omar never seems to get involved with.
It does seem like the kind of thing that more friendly faces in Washington could easily fix, with a couple of lines inserted in a transportation bill. It's the work of actual governing that a Martin Sabo would have fixed years ago, and that Omar never seems to get involved with.
-
wingedmolotov
- Metrodome
- Posts: 94
- Joined: November 11th, 2024, 6:48 pm
- Location: Bloomington
- Has thanked: 8 times
- Been thanked: 9 times
Re: Blue Line Extension - Bottineau LRT
https://metrocouncil.org/getdoc/407f7c4 ... genda.aspxBikesOnFilm wrote:A little frustrating that the Project Decisions Board/PDB for this project doesn't have recorded meetings.
They had a meeting on October 29th where item 6 on the agenda was "Further Scope Reductions," but they have no meeting materials to go along with the agenda. And by the time meeting minutes are published, whatever changes were discussed will probably have been publicly announced at that point.
I have to imagine deferring a station or two would close the budget gap, but I'm sure that would be a contentious subject.
Looks like we’ll find out by November 12th at the latest.
-
BikesOnFilm
- Wells Fargo Center
- Posts: 1338
- Joined: February 20th, 2015, 12:38 pm
- Has thanked: 52 times
- Been thanked: 123 times
Re: Blue Line Extension - Bottineau LRT
Watching the CMC Meeting now...
The section before the scope reductions talk was the ominous news about the proposed updated CIG guidance that will prioritize the Duffy nonsense of birth and marriage rates, as well as a change to 25% of the weight of a project's score being determined by cost effectiveness. BLE scores low on Cost Effectiveness and high on Environmental benefits, which used to be equally weighted at 16.6%, but now cost ranks 25% and environmental ranks 5%.
While they predictably waffled on the direct question "do you feel less confident in the project with this guidance?" the talk didn't seem confident to me. A clear warning that if this is getting done, it needs to be submitted ASAP so it hopefully gets scored under rational governance.
Unfortunately, the first slide of the cost reductions was a list of things they wouldn't consider, and it was all the things that would actually bring the cost of the project down (such as a change in the end point or reducing the number of stations). The justification was that they didn't want to restart the municipal consent process, which to a degree I get, but the results speak for themselves - they found around 190m in accounting reductions and still have a project gap of 224M. There was allusion to resolutions that could help close the gap further but they weren't in the public presentation. If you look at the previous posts on this subject, those 190m in reductions were already accounted for, and a $224m gap is 0% closer to closing the funding gap.
Based on these two pieces of information, and the reality that neither Hennepin County or the Met Council has the willingness to straight up spend the money to close that gap so the submission can be completed before the rug gets pulled out from under the project by the FTA, we might be out of luck on this.
The section before the scope reductions talk was the ominous news about the proposed updated CIG guidance that will prioritize the Duffy nonsense of birth and marriage rates, as well as a change to 25% of the weight of a project's score being determined by cost effectiveness. BLE scores low on Cost Effectiveness and high on Environmental benefits, which used to be equally weighted at 16.6%, but now cost ranks 25% and environmental ranks 5%.
While they predictably waffled on the direct question "do you feel less confident in the project with this guidance?" the talk didn't seem confident to me. A clear warning that if this is getting done, it needs to be submitted ASAP so it hopefully gets scored under rational governance.
Unfortunately, the first slide of the cost reductions was a list of things they wouldn't consider, and it was all the things that would actually bring the cost of the project down (such as a change in the end point or reducing the number of stations). The justification was that they didn't want to restart the municipal consent process, which to a degree I get, but the results speak for themselves - they found around 190m in accounting reductions and still have a project gap of 224M. There was allusion to resolutions that could help close the gap further but they weren't in the public presentation. If you look at the previous posts on this subject, those 190m in reductions were already accounted for, and a $224m gap is 0% closer to closing the funding gap.
Based on these two pieces of information, and the reality that neither Hennepin County or the Met Council has the willingness to straight up spend the money to close that gap so the submission can be completed before the rug gets pulled out from under the project by the FTA, we might be out of luck on this.
-
angrysuburbanite
- Rice Park
- Posts: 458
- Joined: December 31st, 2023, 4:43 pm
- Has thanked: 55 times
- Been thanked: 98 times
Re: Blue Line Extension - Bottineau LRT
This is the stupidest way for this project to die if that's really the case. How disappointing. I really hope that someone can figure something out but there just doesn't seem to be the institutional or political will to support the transit that northwest metro residents deserve at this point.
-