The Knoll - (1101 University Avenue Southeast)
Re: Doran Church Project - (1101 University Avenue Southeast
Building's totally gone and there's a Doran trailer on the site. Did they ever actually get approval to build something here??
Nick Magrino
[email protected]
[email protected]
Re: Doran Church Project - (1101 University Avenue Southeast
That looks pretty cool to me, though the dusk/nighttime renderings always tend to look a bit nicer. The Magic-Pak holes seem to have an inner glow that clearly won't be present in reality.
Anyway, the variety of different surface materials makes me think of the UTEC project. At least this one has the different materials organized in a relatively cohesive way -- the UTEC replacement seemed to be changing the facade almost at random. However, this one doesn't have balconies sticking out, which probably makes it seem a bit less noisy.
Anyway, the variety of different surface materials makes me think of the UTEC project. At least this one has the different materials organized in a relatively cohesive way -- the UTEC replacement seemed to be changing the facade almost at random. However, this one doesn't have balconies sticking out, which probably makes it seem a bit less noisy.
Mike Hicks
https://hizeph400.blogspot.com/
https://hizeph400.blogspot.com/
Re: Doran Church Project - (1101 University Avenue Southeast
This project spells it premier, the other three Doran projects spell it premiere...maybe they'll have some shoppes to make up for it?
Nick Magrino
[email protected]
[email protected]
Re: Doran Church Project - (1101 University Avenue Southeast
Maybe the refrigerators will come pre-stocked with Olde Style?
Re: Doran Church Project - (1101 University Avenue Southeast
I don't know what to think about this. There are a couple larger apartment complexes in this area now that don't fit the area at all. At least that dorm going up down the street is shorter on the University Avenue side to better fit in with the frat houses.
Re: Doran Church Project - (1101 University Avenue Southeast
not olde style........blatz or milwakees best
Re: The Knoll - (1101 University Avenue Southeast)
I can't for the life of me remember if this was ever actually officially approved (they had that dust up with CPED over parking requirements?) but it appears to have a foundation in, so it must've been.
Nick Magrino
[email protected]
[email protected]
Re: The Knoll - (1101 University Avenue Southeast)
Popping up above ground.
Nick Magrino
[email protected]
[email protected]
-
- Capella Tower
- Posts: 2869
- Joined: June 1st, 2012, 9:19 am
Re: The Knoll - (1101 University Avenue Southeast)
Ooooo la la! They should just keep that greenish siding instead of laying pre-fab brick over it (half joking).
Re: The Knoll - (1101 University Avenue Southeast)
The more I drive by this, the more it becomes one of my least favorite projects in a while. It is just so out of character with everything around it.
Re: The Knoll - (1101 University Avenue Southeast)
True, but how long until it is the norm? With the way these things are going up in the area, soon it will fit right in.
Re: The Knoll - (1101 University Avenue Southeast)
This is topped out. That was quick?
Nick Magrino
[email protected]
[email protected]
Re: The Knoll - (1101 University Avenue Southeast)
He's creating jobs for all Minnesotans, guys. I really like being able to see the blue sky through that awning thinger on the top corner, I hope that hole stays open.
IMG_2961 by UrbanMSP, on Flickr
IMG_2961 by UrbanMSP, on Flickr
Nick Magrino
[email protected]
[email protected]
-
- Foshay Tower
- Posts: 913
- Joined: November 17th, 2012, 6:53 pm
-
- Capella Tower
- Posts: 2869
- Joined: June 1st, 2012, 9:19 am
Re: The Knoll - (1101 University Avenue Southeast)
Doesn't look like much has changed in a month...
Re: The Knoll - (1101 University Avenue Southeast)
The weather has certainly gotten worse.
Re: The Knoll - (1101 University Avenue Southeast)
Most of the work, like those near Uptown is electrical, plumbing and sheet rocking on the inside. They will save the exterior until the building can dry out a bit from the snow and rain.Doesn't look like much has changed in a month...
- West Coast
- Block E
- Posts: 21
- Joined: January 12th, 2013, 3:02 pm
- Location: San Francisco
Re: The Knoll - (1101 University Avenue Southeast)
5-13-2013 Construction Photo
Who is online