Re: Harlem Irving and CA Ventures - 250 Hennepin Ave - 21 stories - 256'

Posted: February 7th, 2020, 4:54 pm
by Cat349F
It looks like pre-cast concrete decking, but it’s too small.

Re: Harlem Irving and CA Ventures - 250 Hennepin Ave - 21 stories - 256'

Posted: February 11th, 2020, 10:16 am
by Qhaberl
[IMG]//uploads.tapatalk-cdn.com/202002 ... 26b2.plist[/IMG]

Any thoughts on what is going on here. I have not seen this truck before.

Re: Harlem Irving and CA Ventures - 250 Hennepin Ave - 21 stories - 256'

Posted: February 11th, 2020, 10:16 am
by Qhaberl
[IMG]//uploads.tapatalk-cdn.com/202002 ... 26b2.plist[/IMG]

Any thoughts on what is going on here. I have not seen this truck before.

Re: Harlem Irving and CA Ventures - 250 Hennepin Ave - 21 stories - 256'

Posted: February 11th, 2020, 10:20 am
by HiawathaGuy
Any thoughts on what is going on here. I have not seen this truck before.
It's a sewer vacuum truck. Not sure what it's there for - perhaps they are connecting to the main sewer line and needed it clear. Or something happened in the construction process that needed a vac truck.

Re: Harlem Irving and CA Ventures - 250 Hennepin Ave - 21 stories - 256'

Posted: February 11th, 2020, 12:02 pm
by grrdanko
Any thoughts on what is going on here. I have not seen this truck before.
It's a sewer vacuum truck. Not sure what it's there for - perhaps they are connecting to the main sewer line and needed it clear. Or something happened in the construction process that needed a vac truck.

They are using it for excavation. Vac trucks excavate without causing damage to underground utilities or other structures using pressurized water and the vacuum.

Re: Harlem Irving and CA Ventures - 250 Hennepin Ave - 21 stories - 256'

Posted: March 11th, 2020, 8:06 am
by Qhaberl
Can you tell me about the green tubing that is being placed in the picture?

[IMG]//uploads.tapatalk-cdn.com/202003 ... 7158.plist[/IMG]


Sent from my iPhone using Tapatalk

Re: Harlem Irving and CA Ventures - 250 Hennepin Ave - 21 stories - 256'

Posted: March 11th, 2020, 9:31 am
by twinkess
Isn't that just rebar?

Re: Harlem Irving and CA Ventures - 250 Hennepin Ave - 21 stories - 256'

Posted: March 11th, 2020, 9:41 am
by MNdible
Yeah, looks to be primarily epoxy coated rebar.

It's hard to tell from that photo if there is any post-tensioned cabling in those areas, but if you're seeing something that looks like tubing, it's possible that's what you're seeing.

Re: Harlem Irving and CA Ventures - 250 Hennepin Ave - 21 stories - 256'

Posted: March 11th, 2020, 8:37 pm
by Cat349F
It is coated cable for a post-tensioned concrete deck.

Re: 240 Hennepin Ave - 21 stories - 256'

Posted: March 16th, 2020, 3:43 pm
by twincitizen

Re: 240 Hennepin Ave - 21 stories - 256'

Posted: April 1st, 2020, 8:52 pm
by TroyGBiv
They’ve made good progress, they’ve gotten to ground level... https://app.oxblue.com/open/CA/240-Hennepin

Re: 240 Hennepin Ave - 21 stories - 256'

Posted: July 27th, 2021, 9:40 am
by alexschief
This one has been overshadowed, literally and figuratively, by the Gateway Tower, but if you position yourself just right, you can get a view that makes it stand alone.

Image

This is almost done, and I think it looks fine. But it'll look better when/if its bigger cousin on the Dolphin Staffing site is built.

Re: 240 Hennepin Ave - 21 stories - 256'

Posted: July 27th, 2021, 11:05 am
by uptownbro
17n Washington is actually under construction. They have started on the three story part along 3rd. They are doing this so cars can enter and exit 240 while 17n is being built. Its a solid tower and will look very good when the second tower is done.
Photo credit to the BlueOx: 240 cam from 7/26/2021