200 Central (2019) - 293' / 27 Stories

Northeast, Near North, Camden, Old St. Anthony, University and surrounding neighborhoods
Silophant
Moderator
Posts: 4559
Joined: June 20th, 2012, 4:33 pm
Location: Whimsical NE
Has thanked: 8 times
Been thanked: 22 times

Re: 200 Central (2019) - 293' / 27 Stories

Post by Silophant »

Continued to the Jan. 25th meeting, but here's the abbreviated packet anyway.
Joey Senkyr
[email protected]
alexschief
Wells Fargo Center
Posts: 1153
Joined: November 12th, 2015, 11:35 am
Location: Minneapolis

Re: 200 Central (2019) - 293' / 27 Stories

Post by alexschief »

360 units, 222 parking spaces, you love to see it.
MNdible
is great.
Posts: 6005
Joined: June 8th, 2012, 8:14 pm
Location: Minneapolis
Has thanked: 48 times
Been thanked: 42 times

Re: 200 Central (2019) - 293' / 27 Stories

Post by MNdible »

I mean, it's literally next door to a big parking ramp.
seanrichardryan
Capella Tower
Posts: 3974
Joined: June 3rd, 2012, 9:33 pm
Location: Merriam Park, St. Paul
Has thanked: 7 times
Been thanked: 4 times

Re: 200 Central (2019) - 293' / 27 Stories

Post by seanrichardryan »

Which hasn't been near capacity since 1989.
Q. What, what? A. In da butt.
Minneboy
US Bank Plaza
Posts: 653
Joined: January 15th, 2013, 1:18 pm

Re: 200 Central (2019) - 293' / 27 Stories

Post by Minneboy »

Good news.
go4guy
Foshay Tower
Posts: 905
Joined: June 4th, 2012, 8:54 am

Re: 200 Central (2019) - 293' / 27 Stories

Post by go4guy »

MNdible wrote: January 7th, 2021, 4:47 pm I mean, it's literally next door to a big parking ramp.
True, but that is a 30 year old parking ramp they don't own and can't control the costs of. What kind of selling point is that? "We have no parking, but there is a parking ramp next door. We cannot tell you how much parking will cost, or that the ramp will even be there in a year". If you are going to build a project, you are going to build adequate parking for your tenants.
MNdible
is great.
Posts: 6005
Joined: June 8th, 2012, 8:14 pm
Location: Minneapolis
Has thanked: 48 times
Been thanked: 42 times

Re: 200 Central (2019) - 293' / 27 Stories

Post by MNdible »

I mean, who can see the future? Every other post on this forum suggests that Minneapolis will have eliminated cars by 2040, so problem apparently solved.

But seriously, if the developer thinks they'll have more demand for parking spaces than they're building, they can very easily negotiate a long term parking contract with the ramp next door. And if you're not using your car daily, as I suspect will be true for a significant fraction of the residents, it might be attractive for those renters to pay a lower monthly parking fee for a mildly less convenient parking option.
bubzki2
Foshay Tower
Posts: 807
Joined: September 19th, 2012, 5:38 pm
Location: Snelling-Hamline
Has thanked: 1 time

Re: 200 Central (2019) - 293' / 27 Stories

Post by bubzki2 »

Market forces should naturally allow for allocation of parking and prices according to needs and demands. Yes, the ramp next door might come down someday, but there's always somewhere else to park. Might be a bit farther away and more expensive, but that is exactly how we ween off our SOV addiction in the long run.
alexschief
Wells Fargo Center
Posts: 1153
Joined: November 12th, 2015, 11:35 am
Location: Minneapolis

Re: 200 Central (2019) - 293' / 27 Stories

Post by alexschief »

This is at the Planning Commission now. No changes from the CoW.

Along with the 240 Portland development, a big week for long-suffering short towers. Wonder if they'll actually get built this time.
grant1simons2
IDS Center
Posts: 4286
Joined: February 8th, 2014, 11:33 pm
Location: Marcy-Holmes

Re: 200 Central (2019) - 293' / 27 Stories

Post by grant1simons2 »

It's baaaaaack
Screenshot 2023-02-01 093925.jpg
Silophant
Moderator
Posts: 4559
Joined: June 20th, 2012, 4:33 pm
Location: Whimsical NE
Has thanked: 8 times
Been thanked: 22 times

Re: 200 Central (2019) - 293' / 27 Stories

Post by Silophant »

Lol at those two projects getting equal billing.
Joey Senkyr
[email protected]
TroyGBiv
US Bank Plaza
Posts: 657
Joined: July 6th, 2012, 10:33 pm

Re: 200 Central (2019) - 293' / 27 Stories

Post by TroyGBiv »

I hope this finally moves forward!
Silophant
Moderator
Posts: 4559
Joined: June 20th, 2012, 4:33 pm
Location: Whimsical NE
Has thanked: 8 times
Been thanked: 22 times

Re: 200 Central (2019) - 293' / 27 Stories

Post by Silophant »

The MHNA agenda is up, with a link to a collection of renderings that appear to be unchanged from the CPC presentation from two years ago. Apparently 20% of the units will be affordable at 60% AMI, and an additional 30% will be affordable at 80% AMI, which I think is new, though.
Joey Senkyr
[email protected]
MNdible
is great.
Posts: 6005
Joined: June 8th, 2012, 8:14 pm
Location: Minneapolis
Has thanked: 48 times
Been thanked: 42 times

Re: 200 Central (2019) - 293' / 27 Stories

Post by MNdible »

Yeah, they're apparently planning to access the city's Inclusionary Zoning TIF money to fund the project, which requires meeting higher levels of affordability.
User avatar
Nathan
Capella Tower
Posts: 3558
Joined: June 1st, 2012, 10:42 am

Re: 200 Central (2019) - 293' / 27 Stories

Post by Nathan »

The design has changed, it has lost the slight inward angle of the exterior walls. Not a major change, but it has lost some dynamics. The slight angle would have provided some interesting light play to an otherwise very static box.
twincitizen
Moderator
Posts: 6310
Joined: May 31st, 2012, 7:27 pm
Location: Lake Hiawatha
Has thanked: 33 times
Been thanked: 85 times

Re: 200 Central (2019) - 293' / 27 Stories

Post by twincitizen »

Is the developer still Alatus? IIRC from a couple years ago after this switched to rentals and lost some height, it was going to be a different developer leading the project.
nordeast homer
US Bank Plaza
Posts: 699
Joined: June 1st, 2012, 11:11 am

Re: 200 Central (2019) - 293' / 27 Stories

Post by nordeast homer »

CA Ventures took this one over from Alatus.
John21
Rice Park
Posts: 459
Joined: June 8th, 2012, 8:23 am
Has thanked: 12 times

Re: 200 Central (2019) - 293' / 27 Stories

Post by John21 »

I remember a friend of mine telling me Alatus was selling this project and the one by the convention center. Wonder what happened to that one? I liked both.
directorCBO
Block E
Posts: 3
Joined: February 4th, 2021, 8:35 am

Re: 200 Central (2019) - 293' / 27 Stories

Post by directorCBO »

Alatus is still the sponsor - CA Ventures / CRG are no longer involved.

The building is 20% of units @ 50% AMI (rent and income), 30% at 80% AMI (rent and income), and the remainder is market-rate.
nordeast homer
US Bank Plaza
Posts: 699
Joined: June 1st, 2012, 11:11 am

Re: 200 Central (2019) - 293' / 27 Stories

Post by nordeast homer »

Really?! Wow! I hope they can make it happen this time.
Post Reply