I'm glad to hear that. Want to see this project get underway. We'll have another big hole filled soon then.According to a friend who received communication from management at Dock Street Flats, they're having the surveyor there today to plot the placement of a temporary construction fence.
T3 - Hines Dock Street Office Project
Re: T3 - Hines Dock Street Office Project
Re: T3 - Hines Dock Street Office Project
I'm excited about this one!
http://www.bizjournals.com/twincities/b ... ction.html
"Crews prep Hines' T3 office site for construction (Photos)"
http://www.bizjournals.com/twincities/b ... ction.html
"Crews prep Hines' T3 office site for construction (Photos)"
Re: T3 - Hines Dock Street Office Project
I'm excited about this project as well! It reinforces the Minneapolis tradition and reputation of being forward thinking in architecture.
Re: T3 - Hines Dock Street Office Project
Filling in another big hole on the fringe of the downtown.
-
- Moderator
- Posts: 6392
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: T3 - (Dock Street)
Do we know how close to the Cedar Lake Trail this building will be??
Re: T3 - Hines Dock Street Office Project
I biked by there the other day and based on where they were driving the pilings, just about as close as the condo building that's next door.
Re: T3 - Hines Dock Street Office Project
Here's a view from the walkway on the 3rd St bridge. Dock Street is in the background at the top of the photo. You can see the proximity of the trail to the piles. I'm curious about the square foundation-thing they've uncovered.
Construction of the T3 building. by Mostly Zeke with Lots of Alex, on Flickr
Construction of the T3 building. by Mostly Zeke with Lots of Alex, on Flickr
Re: T3 - Hines Dock Street Office Project
As I recall, the site plans showed that the building had a ground level arcade paralleling the Cedar Lake trail that would allow for additional pedestrian circulation along that face.
Re: T3 - Hines Dock Street Office Project
Biking by along the overpass last night and it looks like the excavation may have caused a 50 foot long or so fissure in the adjoining bike trail. Already cordoned off and filled in with asphalt by the time I saw it (bikers can still get by).
-
- IDS Center
- Posts: 4369
- Joined: February 8th, 2014, 11:33 pm
- Location: Marcy-Holmes
Re: T3 - Hines Dock Street Office Project
I saw that on Twitter today. There was a replay that stated public works is already working to fix it.
-
- IDS Center
- Posts: 4672
- Joined: July 21st, 2013, 8:57 pm
- Location: Where West Minneapolis Once Was
Re: T3 - Hines Dock Street Office Project
And close to the active rail line too to be a serious worry.
-
- IDS Center
- Posts: 4369
- Joined: February 8th, 2014, 11:33 pm
- Location: Marcy-Holmes
Re: T3 - Hines Dock Street Office Project
I'm pretty sure we could make this go viral claiming there was an earthquake in Minneapolis.
Via Scott Shaffer: Hey @MetroTransitMN if you like Northstar, you might want to send some engineers to check out this construction area.
Via Scott Shaffer: Hey @MetroTransitMN if you like Northstar, you might want to send some engineers to check out this construction area.
Re: T3 - Hines Dock Street Office Project
I was surprised that the T3 is set back from 3rd Ave. I spaced off that there is the road to get down to the lower parking and the stadium. Has there been any diagrams of the interior of this building shown yet?
-
- Block E
- Posts: 21
- Joined: October 30th, 2013, 3:55 pm
Re: T3 - Hines Dock Street Office Project
I bike through there every day and it's getting progressively worse. The fissue is deeper and the elevation between sides is now noticibly different. It feels like the T3 side is pulling away and sinking. The most notavble difference has been in the last two days.
-
- Moderator
- Posts: 6392
- Joined: May 31st, 2012, 7:27 pm
- Location: Standish-Ericsson
Re: T3 - Hines Dock Street Office Project
May as well wait until the project is above ground before fixing it though, right? Pain in the ass as it may be, it's probably not advisable for them to repair it now. I'm guessing it stays like this until next spring.
-
- IDS Center
- Posts: 4672
- Joined: July 21st, 2013, 8:57 pm
- Location: Where West Minneapolis Once Was
Re: T3 - Hines Dock Street Office Project
As long as the slouching doesn't affect the rail running through, best to wait until the work is completed.
-
- Union Depot
- Posts: 321
- Joined: July 3rd, 2014, 1:38 pm
- Location: Lyndale Neighborhood
Re: T3 - Hines Dock Street Office Project
Is it also made of wood?Tower crane going up today.